Engineering notes from the floor.
Operational write-ups, build posts and post-incident summaries — written by the engineers who run the facility and the fabric, not by marketing.
Latest from DFDC.
Data Facilities Data Centers Appoints Roy Premchand as Interim Commercial Director
Appointment strengthens DFDC’s commercial team as the carrier-neutral campus in The Hague prepares Phase II and builds out its position as a carrier hub between north and south …
ReadMore from DFDC.
Introducing BareFABRIC: a ten-location metro fabric, included on every port
BareFABRIC is live. Fourteen facilities, five product surfaces, one API. Every BareFABRIC Port at THG1 ships included — no per-port peering uplift,…
ReadDFIP launches with Frys-IX as the first internet exchange aboard
The Data Facilities Internet exchange Program is open. Frys-IX is the first internet exchange to take a position, bringing the northern Dutch…
ReadIn the lab: how we designed THG1 Phase 1
An engineering note on the design choices behind THG1 Phase 1 — distributed 2N+1, four generators, six fiber routes, VRKI 2.0 Class…
ReadAudit complete: SOC 2 Type II issued, ISO 9001 and 27001 renewed
Three-year renewal of ISO 9001:2015 and ISO 27001:2022 was completed in August 2025; the SOC 2 Type II attestation window closed in…
ReadMilestone reached: 1.75 MW of new capacity now online at DFDC The Hague
As of April 9 we have brought the first 1.75 MW of additional power online — a key step in our 3.5…
ReadWant these in your inbox?
New posts as they go live. Engineer-written, no marketing fluff. Drop us a line and we will add you to the list.